Company · One roof

The umbrella company for gravity plants.

One offer carries the whole plant: test work, flowsheet, concrete and steel, machines, installation, water treatment and commissioning. BENEFSAN is registered in Dubai; the ore is tested at industrial scale in Bursa.

Exterior of the industrial-scale testing centre building in Bursa, with a feed hopper and conveyor in front
Industrial-scale testing centre, Bursa

Key facts

The company in eight lines

Two places, one offer, one way of separating.

Contact the engineers
Legal name
BENEFSAN Mining Machinery LLC
Registered office
Meydan Free Zone, Dubai, United Arab Emirates
Test centre & warehouse
Bursa, Türkiye · industrial-scale test work
Management system
ISO 9001
Contract model
Turn-key, umbrella contractor — single point of accountability
Scope
Civil · steel · machines · installation · water · commissioning — one offer
Separation
Gravity only — shaking tables, classifiers, jigs
Ores
Gold · chromite · lead & barite · pyrite · tin · tungsten · antimony

Principles

Four principles on every job we take

The same four lines govern a turn-key plant, a single shaking table and a test-work programme. They are how a small team keeps its word on a large contract.

See the ten steps
  1. One roof.

    Concrete, steel, machines, installation and water treatment in one offer — one responsibility, no gaps between contractors.

    Test work, flowsheet, civil works, steel structure, machines, installation, electrics, water treatment and tailings, commissioning, training and a 12–24 month performance warranty — every sub-scope is carried out under BENEFSAN's responsibility.

  2. Gravity first.

    Density does the separating. No reagents, low energy, a residue that can be stacked.

    Shaking tables at the core, with hydraulic classifiers and jigs where the ore allows. Process water runs in a closed loop; tailings leave the plant dewatered and stackable.

  3. Ore first.

    Every circuit begins with your sample on a shaking table at Bursa, not with a catalogue page.

    Industrial-scale test work and pilot-plant runs at the Bursa test centre; the results become the flowsheet, the mass and water balance and the plant layout.

  4. Small team.

    An engineering-led shop. You talk to the people who design, build and commission the plant.

    Your message lands in an engineer's inbox, not a CRM, and is answered within 48 hours. Projects we should not do, we say so directly.

Reference work

Two plants on the drawing board, and the test work behind them

Gravity plants designed from pilot-plant test work in Bursa, and the programmes that ran before a line was drawn. Client names are withheld; each card shows the figures fixed at the preliminary stage.

Test work & flowsheet
Multi-storey blue steel structure of a beneficiation plant under construction, with equipment installed
Plant structure during construction

Reference · Gold in pyrite

Gravity beneficiation plant for gold entrapped in pyrite — Kazakhstan

Commodity
Gold in pyrite
Feed
300 t/h
Investment
≈ USD 10.6 M
Scope
Test work · chemical analysis · preliminary flowsheet
Stage
Preliminary flowsheet issued
Shaking-table deck during a gravity test, mineral bands forming along the riffles
Shaking-table test, mineral bands forming

Reference · Pyrite & lead

Pyrite and lead gravity beneficiation plant — Romania

Commodity
Pyrite · lead
Route
Gravity · shaking tables as separators
Scope
Pilot-plant test work → gravity process → preliminary layout
Stage
Preliminary layout issued
Gravity test on a shaking table at the Bursa test centre: slurry spreading across the riffled deck as the heavy mineral separates into a band
Shaking-table gravity test, Bursa test centre

Reference · Test-work programmes

Industrial-scale gravity test work, Bursa

Programmes
Pyrite on shaking table · graphite · lead & barite gravity · chromite plant wastes
Facility
Industrial-scale testing centre and warehouse, Bursa, Türkiye
Scale
Industrial-scale · pilot-plant runs

Photographs show BENEFSAN plants and test work; they are not paired to a named client. A further reference — recovery lifted from 78.5% to 89.4% within 12 months on a mature plant — comes from optimisation work on a running circuit.

Places

Tested at industrial scale in Bursa.

An industrial-scale testing centre and warehouse in Bursa, Türkiye, where the ore runs on the shaking tables before a flowsheet is drawn. The company is registered in Dubai; the engineers are a phone call or an e-mail away.

Talk to an engineer
Stacked multi-deck shaking-table frames on steel skids inside the Bursa warehouse
Shaking-table frames in the Bursa warehouse

Bursa · Türkiye

Test centre & warehouse

Industrial-scale test work on your sample before a line of the flowsheet is drawn: pyrite on the shaking table, graphite, lead and barite by gravity, chromite plant wastes. The warehouse beside it holds the shaking-table frames and pilot equipment.

Scale
Industrial-scale test work
Programmes
Pilot-plant runs on your sample
Visits
Site visit normally within 4 weeks

Contact

Phone and e-mail

Enquiries land in an engineer's inbox. A paragraph on the commodity, throughput and region is enough to start; assays and resource statements travel under a short mutual NDA.

Time zone
GST+04

The team

Same people, dialled up or down

A small, engineering-led team. The engineers who run your test work in Bursa are the ones who draw the flowsheet, size the equipment and see the plant through commissioning — whether the scope is a turn-key plant, a single machine or a test-work programme.

What one offer covers