Umbrella contractor · Gravity beneficiation plants · Dubai · ISO 9001

Turn-key gravity plants, from the first concrete to the first concentrate.

BENEFSAN is the umbrella company for the whole plant: test work, flowsheet, concrete and steel, machines, installation, water treatment and commissioning — one offer, one responsibility, a gravity circuit built around your ore.

  • Gold in pyrite · Gravity plant · 300 t/h · Kazakhstan
  • Pyrite & lead · Shaking tables · Romania
  • Gold · Free-milling · 96.1% rec
  • Chromite · gravity · 48% Cr₂O₃
  • Concrete · Steel · Machines · Water — one offer
  • Performance warranty · 12–24 months

One offer · One roof

Everything under the BENEFSAN roof.

The client signs one offer and receives a running gravity plant. Civil works and steel structure are not left to others: they are drawn, poured and erected inside the same contract as the machines, the installation and the water treatment.

Read the full scope
  1. 01

    Test work & flowsheet

    Your sample on the shaking tables at Bursa; then flowsheet, balances and layout.

  2. 02

    Civil works & concrete

    Foundations, slabs, terraces and drainage — poured inside the same offer.

  3. 03

    Steel structure

    Plant building and equipment structures fabricated, erected and painted.

  4. 04

    Machines

    Crushing, grinding, classification, shaking tables, dewatering — under our responsibility.

  5. 05

    Installation

    Machines set, aligned, piped and pumped into a single line.

  6. 06

    Electrics & automation

    Motor control centre, cabling, instrumentation, control room.

  7. 07

    Water treatment & tailings

    Thickening, filtration, clarified water return, stackable tailings.

  8. 08

    Commissioning & warranty

    Ramp-up to the guaranteed figures, operator training, 12–24 month warranty.

Eight scopes, one offer, one responsible party. Sub-scopes are carried out under BENEFSAN responsibility.

Walk the plant

Ore in, concentrate out — select a unit

A simplified gravity plant: crushing, grinding in closed circuit with classification, shaking tables, then thickening and filtration with the process water returned to the mill. Each unit tells you its duty, its equipment and which scope of the offer owns it.

Equipment register
Flowsheet — ore in, concentrate out Simplified gravity plant flowsheet: feed hopper, jaw crusher, mill in closed circuit with a hydrocyclone and hydraulic classifier, two shaking tables (rougher and cleaner), lamella thickener and filter press. The concentrate stream is gold, tailings grey, and process water (dashed blue) returns to the mill. Feed Crush Grind Classify Shaking tables Thicken Filter Concentrate Tailings Process water
Flowsheet — ore in, concentrate out (stacked) Simplified gravity plant flowsheet laid out top to bottom: feed hopper, jaw crusher, mill, hydrocyclone and classifier feeding two shaking tables, thickener and filter press; concentrate stream gold, tailings grey, process water returned by a dashed blue line. Feed Crush Grind Classify Shaking tables Thicken Filter Concentrate Tailings Process water
  • Ore
  • Concentrate
  • Tailings
  • Process water (closed loop)

Select a unit on the diagram or in the index below · arrow keys step through

  1. 01Feed
  2. 02Crushing
  3. 03Grinding
  4. 04Classification
  5. 05Shaking tables
  6. 06Thickening
  7. 07Filtration
  8. 08Water return
  9. 09Concentrate
  10. 10Tailings

Unit 01 · Crushing unit

Feed

01 Crushing unit

Run-of-mine ore received, stored and metered to the primary crusher.

Equipment

  • Bunkers and feed hoppers
  • Conveyor belts
Owned by 03 Engineered equipment
UnitDivisionDutyEquipmentOwned by
Feed01 Feed & crushingRun-of-mine ore received, buffered and metered to the primary crusher.Bunkers and feed hoppers · Conveyor beltsScope 04 · Machines
Crushing01 Feed & crushingPrimary and secondary size reduction to mill feed size.Jaw crushers · Cone crushers · Vibrating screensScope 04 · Machines
Grinding02 Grinding & classificationLiberation to the size the shaking-table tests set — rod or ball mill, never finer than the ore needs.Rod mills · Ball millsScope 01 · Test work & flowsheet
Classification02 Grinding & classificationCoarse particles return to the mill; the hydraulic classifier splits the rest into density-and-size fractions, one feed per table bank.Hydrocyclones · Hydraulic classifiers · Micronised screensScope 01 · Test work & flowsheet
Shaking tables03 Gravity concentrationThe concentrating heart: rougher and cleaner shaking tables on terraces, with jigs where the ore asks for them. No reagents.Shaking tables · JigsTurn-key gravity plants
Thickening04 Dewatering & waterConcentrate and tailings thickened in lamella thickeners; the bulk of the process water is recovered here.Lamella thickenersScope 07 · Water treatment & tailings
Filtration04 Dewatering & waterFilter presses and dewatering screens — drier concentrate, stackable tailings, no pond where the site allows it.Filter presses · Dewatering screens · Dewatering tablesScope 07 · Water treatment & tailings
Water return04 Dewatering & waterClarified water pumped back to the mill and the tables; make-up water covers losses only.Slurry pumps · Pump and piping systemsScope 05 · Installation
Concentrate03 Gravity concentrationSaleable product — grade and recovery measured against the figures fixed at feasibility and guaranteed at handover.Concentrate dewatering and handlingScope 08 · Commissioning & warranty
Tailings04 Dewatering & waterDewatered, stackable residue — and a feed for reprocessing one day, if value is left in it.Tailings dewatering and stackingTailings & waste reprocessing

In one line

Ore in. Concentrate out. Everything between is ours.

Test work, flowsheet, concrete, steel, machines, installation, water treatment, commissioning and the warranty that follows — one team carries the gravity plant from the first sample to a running handover.

48 h

Reply to enquiries

engineer’s inbox, not a CRM

4 weeks

To site

normally, after a serious enquiry

12–24 mo

Performance warranty

wear parts · operator training · tuned at handover

+10.9 pt

Recovery reference

mature plant · 78.5% → 89.4% in 12 months

Numbers from our own test work and one audited plant — every figure carries its context line.

How we work

Every plant walks the same ten steps.

Prove the ore, permit the site, let the laboratory decide the process — then design, build, order the circuits, install and energise.

Walk the ten steps